POWER GRIDS 2026, one of the most professional power grid exhibitions in Eastern Europe, will be held at the Timiryazev Exhibition Center in Moscow, Russia, from November 17 to 19, 2026.
ZTELEC GROUP, together with Xujue Electrical, will take part in this influential event at Booth B29. We will showcase a full range of electrical insulation materials and power accessories for the Russia and CIS markets.

The exhibition focuses on smart grid transformation, renewable energy integration and power equipment reliability.
It connects grid operators, EPC contractors and electrical manufacturers across the region, making it a valuable platform for discussing market trends and new project needs.
Visitors can explore our comprehensive electrical insulation portfolio, including:
Insulation boards and pressboard for transformer and reactor insulation structures.
FRP tubes and laminated rods for reliable mechanical and dielectric performance.
Profile parts and custom insulation components made to your drawings and technical requirements.
All products comply with IEC and GOST standards. They are suitable for power equipment working under extremely cold conditions.
Typical applications include transformers, reactors, switchgear and compact substations.
Xujue Electrical brings decades-long expertise in insulation R&D and production.
ZTELEC GROUP adds complete supply capacity for power transmission equipment.
Together, we deliver stable, tailored insulation solutions for global power projects.
We sincerely invite all partners and customers to visit Booth B29. Let’s discuss market trends and build a greener, more reliable power ecosystem together.
| Event | POWER GRIDS 2026 |
|---|---|
| Date | November 17–19, 2026 |
| Venue | Timiryazev Exhibition Center, Moscow, Russia |
| Booth No. | B29 |
| Exhibitors | ZTELEC GROUP & Xujue Electrical |
Planning to attend? Contact ZTELEC GROUP to book a meeting at Booth B29 and request samples or a quotation for your insulation requirements.
If you need our products please write down any questions, we will reply as soon as possible.
There are three ISO certificates for quality certification. The certificates will be shown later. ISO
After receiving the advance payment, the production cycle is 15-25 days. And the transportation cycle should be calcul……
We supply with installation guide and user manual for each transformer. If you do not understand them. We will offer v……